Webster Square Plaza
Star Market, Marshfield, MA
Demolition and construction of new supermarket including boundary, topographic and detail survey and design of new site layout including the relocation of arterial Snow Road, sewer force main, accessible parking lots, and pedestrian routes. Our talented team provided architectural design to rejuvenate a dated retail complex as well as landscape architectural services.
Mount Skirgo Ridge, Marshfield, MA
100 acre site consisting of multiple uses and projects including the following:
Mount Skirgo Ridge Definitive Subdivision
Project Photos
A new 30 lot residential subdivision surrounded by open space.
The Reserve at Mount Skirgo
A new 55 unit age restricted cape cod style village bordering conservation land and walking trails.
Commerce Green
Planned Mixed Use & Development (PMUD) Project containing a supermarket, nursing home and assisted living facility, mixed office/residential and other retail use.
Enterprise Park, Marshfield, MA
88 acre/30 lot commercial industrial subdivision, a vital addition the town’s economic base.
Animal Rescue League Shelter Facility, Pembroke, MA
New state of the art facility for care and sheltering of animals on a 60-acre site in Pembroke.
BBC Construction Company
Canton Public Library
Provided construction layout survey work for addition to building.
BBC Construction Company
Summer Street Elementary & Huckleberry Elementary, Lynnfield Schools
Provided construction layout survey work.
BBC Construction Company
Silverlake High School, Kingston
Provided construction layout survey work.
BBC Construction Company
Williams Elementary School, West Bridgewater
Provided construction layout survey work for addition to building.
Plimoth Plantation
Master Planning, Handicap Accessibility and Sanitary Facilities Improvements Including a complete existing conditions plan and analysis of projected improvements over next fifty years.
Pleasant Spring Pond Estates
Sundance Realty Trust
Residential Subdivision Survey and engineering design.
HKT Architects for Scituate High
Scituate High School Renovations
Including complete existing conditions plan and designs of roadway parking, drainage and infrastructure improvement.
HKT Architects for Town of Holbrook
Holbrook Public Safety Building
Engineering and design. The building is currently under construction and will serve as the combined headquarters for both the fire police departments.
William J. Chase
30+/ acre Land Court Boundary Survey, Rockland, MA
Survey and Engineering Design
Headstart Daycare Center Marshfield, MA
6,000 Square Foot Daycare Survey and Site Planning.
Brant Rock Seawall Repair for Marshfield DPW
Seawall Reconstruction, Existing Conditions Survey and Creation of Town Easements
BBC Construction Company
Abington Middle High School
Project Photos
235,370 Square Foot School: Provided foundation and structural steel layout including complex architectural features.
Colonial Federal Savings Bank – Holbrook, MA
2,500 Square Foot Bank: Site engineering design. Project Highlights- Subsurface rechanneling of intermittent stream, compensatory flood storage to meet flood zone requirements.
BBC Construction Company
Hanover Center/ Sylvester School – Hanover, MA
46,735 Square Foot School Renovation and Addition: Provided foundation and structural steel layout for construction.
Brewster Ambulance Headquarters and Training Facility – Weymouth, MA
Project Photos
35,000 Square Foot Building: Provided site engineering and permitting for new construction. Improved site permeability by reducing impervious coverage, improved on-site drainage with subsurface drainage systems and stormwater pretreatment, state curb cut, conservation and planning board permitting. On-site fueling station.
Quirk Chrysler Dodge Jeep Ram Dealership – 955 Plain St. Marshfield, MA
Project Photos
40,175 Square Foot Vehicle Showroom and Service Facility: Provided site engineering design and permitting. Designed on-site fueling station and fuel containment area. Site in Water Resource Protection Area.
Winter St. Industrial Warehouse Addition – Pembroke, MA
Project Photos
15,750 Square Foot Warehouse Addition: Provided site design, permitting and engineering services. Included subsurface stormwater management system installation and septic system expansion.
Rockwood Road Field Complex – Marshfield, MA
Project Photos
16 Acre Multi-use Athletic Field Complex: Provided site design and engineering.
Washington Square and Jefferson Square – Pembroke, MA
Project Photos
New Construction of Twelve Town Homes: Provided site engineering, permitting, and property surveying.
O’Leary – Braintree, MA
Residential homes converted to multi-family homes: Provided site engineering, permitting, and property surveying. Combined two parcels, increased green space on the property.
Stor – It Mini Warehouses- Marshfield, MA
New construction of Self Storage Facility: Provided site engineering, permitting, and construction layout. Includes subsurface drainage systems.